VACUUM FORMING MACHINE ,shoe vacuum heat setting machine
no1.Steam spray device is adopted to wet the shoes uppers which later should be
dried up by rapid neating before being shaped and rubbed by vacuum system.
no2.Different temperature for toe tip and heel could be adjusted due to different material
and reaches the best result,vacuum processing period is 3-5 mins.
no3.The lasts and shoes be well fitted in the vacuum and which resulted in more everlasting shape of shoes.
no4.For saving time.upgrading productivity and consistant quality.
no5.To enhence the productivity and to stablize the quality.
Technical specifications:
MODEL | Dimensions(L*W*H) | PRODUCTION | N.W | VOLTAGE | POWER |
DF-906 | 4800*1520*2020mm | 300pairs/8jrs | 2290kg | 380V/50Hz | 32KW |
VACUUM FORMING MACHINE ,shoe vacuum heat setting machine
no1.Steam spray device is adopted to wet the shoes uppers which later should be
dried up by rapid neating before being shaped and rubbed by vacuum system.
no2.Different temperature for toe tip and heel could be adjusted due to different material
and reaches the best result,vacuum processing period is 3-5 mins.
no3.The lasts and shoes be well fitted in the vacuum and which resulted in more everlasting shape of shoes.
no4.For saving time.upgrading productivity and consistant quality.
no5.To enhence the productivity and to stablize the quality.
Technical specifications:
MODEL | Dimensions(L*W*H) | PRODUCTION | N.W | VOLTAGE | POWER |
DF-906 | 4800*1520*2020mm | 300pairs/8jrs | 2290kg | 380V/50Hz | 32KW |